Miami-Dade County
Demolition in El Portal
Village of El Portal, with its own published demolition permit procedure.
El Portal is a small village with its own building department sitting inside Miami-Dade, so the permit is issued locally while the county requirements continue to apply on top. It is the same two-track pattern as the City of Miami, on a much smaller scale.
Because the village is small, the sensible first step is a direct conversation about submission and review rather than an assumption carried over from the county's unincorporated process. Construction hours in particular are worth confirming rather than inheriting, since they differ between jurisdictions in this county by as much as three hours a day and they set the programme.
What does not change is the county layer: the asbestos survey before demolition whatever the age of the building, the federal notification with its ten working days, and DERM. Those run on their own clock and are the reason the paperwork, not the machine, usually decides the date.

What is different here
Each line below is taken from a published requirement, not from a general description of the area. This is the part that moves your dates.
- 01One of the few small municipalities in the county that publishes its own demolition submittal checklist rather than deferring to a generic process.
- 02The asbestos assessment report is required for commercial properties on that checklist, a narrower trigger than the county rule that a survey is required for all demolition projects. Both still apply, so the county requirement governs.
- 03The checklist calls for disconnect letters from electric, gas and telephone, a current signed and sealed survey, demolition plans and specifications, water and sewer capping, a sidewalk bond and a fence permit.
Sources
Requirements change. Verify anything you intend to rely on with the issuing department before you plan around it.